Showing posts with label frame. Show all posts
Showing posts with label frame. Show all posts

Saturday, 13 February 2016

More frame mods ...


The hangers have been mostly fabricated ... not finished yet, but well underway ....


And the bottom engine mounts are now also finished :o)


Wednesday, 23 December 2015

Rolling Chassis is almost there.

TL1000S forks mated to the frame with Bandit 1200 swingarm, wheels & brakes. Thanks to Cambridge Motorcycles who have done the work thus far. David 'Spike' Abraham working his magic as usual!






There's still loads and loads of work to do. To complete the rolling chassis alone:
  • Rear brake and torsion arm
  • Dry fit everything and then de-lug what's not required.
  • Clipons
  • Weld lugs and fit rearsets
  • Front and Rear brake master cylinder
  • Braided hoses
  • Finish frame bracing to headstock
  • Buy a TL front fender
  • Inner bearing tubes
Then we can take it all apart again and send it off for powder coating.

So just in the interests of getting a feel for things I offered up the Seat etc...

So to my eyes .. that has lots of potential!


Monday, 14 December 2015

Undertray

Just had a quick text conversation with Steve Adam's of Lucky 7 Moto - he's making a batch of undertrays in January ... so the order is in with him for one. This will tidy up the rear end of the Katana, keep that central "V" section looking empty and provide a space for the battery and rectifier to live under the seat.








Saturday, 12 December 2015

Frame bracing

So having spent a fair bit of time mulling over the Muscle Kat build - and studying internet posts. I have decided I'm going to spoil the frame powder coating and invest the effort now to get the frame braced.

http://oldskoolsuzuki.info/archives/315 for further details. However, rather than go with the box section in the  middle triangle, I decided that tubing would look better.

So frame, some TL1000s forks, bandit wheels and swing arm, Ohlins, and discs and brake callipers have been delivered to  Cambridge Motorcycles and left in the hands of Spike - mission one is to get to a rolling chassis.


Here's where we were up to when I visited on Saturday.







Spike has left the front section bracing for now until we get the tank on the frame to check clearance.

We've also noted that the TL1000S forks have lock stop lugs - so we can weld in a couple of lock stops to allow us to remove some more frame boxing around the head stock - that is there only to provide a point for some rubber mounted lock stops used with the original forks.

I should have the finished rolling chassis back before Christmas - we can then start think about a dry build, lug removal and what the next steps should be.


Food for thought ...