- Chain and sprocket alignment
- Rear shocks spacers and bolts sourced and fitted
- Footrest hangers fabricated and fitted
- Additional frame bracing to headstock added
- Brakes and gear linkages connected
- Clutch checked and new cable fitted
- Front wheel bearing support fitted
- Rear brake torsion bar fabricated and fitted
- All engine mounts in place
- Coils (albeit two different ones) fitted
- Exhaust gaskets sourced and exhaust test fitted
That's a period Harris exhaust being test fitted. Pretty sure it will work ...
... and that's the Mikuni VM29SS flat slide carbs of a Slingshot GSXR750. Should be enough for the 1100 motor for now. If we tune this motor then we'll need something a little more meaty.
Not sure next steps just yet:
- Spotted and issue with the carbs that needs solving
- Exhaust hanger needs fabricating
- Electrics need laying out with under-seat placement.